Close Overlay
Reference List: Nuclear inspection and repair work

Nuclear Diving

Nuclear Diving

Maintenance, inspection and repair work in fuel rod storage pools

Brokdorf, Germany

Nordseetaucher inspected the welding seams in the stainless steel liner sections of the fuel element pool and covered them with an additional coating to ensure that they remained leak proof. This contract, which was carried out in cooperation with Siemens/KWU, took 17 weeks.

Brokdorf

Storage pool

Almaraz, Spain

In cooperation with Siemens/KMU, we repaired and recoated several small defects in the liner of the fuel rod storage pool. The job took 5 weeks.

Almaraz

Storage pool

Nuclear Helmet


Slovenia

In cooperation with Framatome-Siemens, we replaced several of the storage racks in the fuel rod storage pool with new racks with a greater capacity.
The job took 8 weeks.

Krsko

Storage pool

Nuclear Helmet

Garching, Germany

Together with Framatome AnP we carried out maintenance work in the reactor pool and the settling pool at the research reactor FRM II Garching by Munich.

Garching

Fuel rod storage pool