TBMs: 122 /
| Title | Year | Country |
| M-000 Emstunnel | 2009 | Germany |
|
M-000 Emstunnel
|
||||||||||||
| M-000 Europipe I+II | 1994 | Germany |
|
M-000 Europipe I+II
This project saw the successful construction of the largest and longest pipeline built by a high-tech boring machine starting from a single shaft. The machine used was a mixed shield AVN 3000D. |
||||||||||||||
| M-000 Jenbach | 2009 | Austria |
|
M-000 Jenbach
|
||||||||
| M-000 Jenbach | 2009 | Austria |
|
M-000 Jenbach
|
||||||||
| M-000 Jenbach | 2009 | Austria |
|
M-000 Jenbach
|
||||||||
| M-000 Medientunnel, Leipzig | 2005 | Germany |
|
M-000 Medientunnel, Leipzig
|
||||||||
| M-000 Newa Crossing, St. Petersburg | 2001 | Russia |
|
|
M-000 Newa Crossing, St. Petersburg
An AVN 2000D microtunnelling system, specifically developed for this project, drove a protective pipe for an oil pipeline under the 600 m-wide river Newa close to St. Petersburg. The remote controlled high-tech tunnelling system excavated 775 m under the river to reach the reception shaft inch-perfect on the other bank. |
||||||||||||||
| M-0000 CFPP Kraftwerkstunnel W.-haven | 2011 | Germany |
|
M-0000 CFPP Kraftwerkstunnel W.-haven
|
||||||||
| M-0000 Düker Brunsbüttel | 2010 | Germany |
|
M-0000 Düker Brunsbüttel
|
||||||
| M-0000 Köhlbrandthöft, Hamburg | 2010 | Germany |
|
M-0000 Köhlbrandthöft, Hamburg
|
||||||
| M-1016 M Santander | 2007 | Spain |
|
M-1016 M Santander
|
||||||||
| M-1186 Jeddah | 2010 - 2011 | Saudi Arabia |
|
M-1186 Jeddah
|
||||||
| M-1193 Jenbach | 2008 | Austria |
|
M-1193 Jenbach
|
||||||||||
| M-1198M Doha, Qatar | 2008 | Qatar |
|
M-1198M Doha, Qatar
|
||||||||||||||
| M-1317 Sammler Ost Hamburg | 2010 | Germany |
|
M-1317 Sammler Ost Hamburg
|
||||||||
| M-1419M Opal Peene Querung | 2010 | Germany |
|
M-1419M Opal Peene Querung
|
||||||||
| M-254M Sammler Ost, Hamburg | 2008 - 2009 | Germany |
|
M-254M Sammler Ost, Hamburg
|
||||||||
| M-498 Mompas - San Sebastian | 1999 | Spain |
|
M-498 Mompas - San Sebastian
Sewer tunnel in San Sebastian, Spain. |
||||||||||
| M-518 TENP, Section 4/5, Lörrach | 2002 | Germany |
|
M-518 TENP, Section 4/5, Lörrach
The parallel pipe of the TENP (Trans-European Natural Gas Pipeline) between Bahlingen-Thiengen and Hüsingen-Wallbach crosses the Rhine at Schwörstadt. The tunnel was driven with a hydroshield TBM with segment lining. The tunnel was 3.0 m in diameter and around 390 m long. |
||||||||||||||
| M-518M Grossrohrschirm, Zürich | 2010 | Switzerland |
|
M-518M Grossrohrschirm, Zürich
|
||||||
| M-518M Pescanova Mira | 2008 | Portugal |
|
M-518M Pescanova Mira
|
||||||||||
| M-532 4th Tube of the Elbe Tunnel/Cross Passages, Hamburg | 2000 | Germany |
|
M-532 4th Tube of the Elbe Tunnel/Cross Passages, Hamburg
The south and central emergency tunnels act as escape routes from the forth tube to the existing Elbe Tunnel and vice versa. They meet, with a certain margin, in the existing west bore. The emergency tunnels were driven with a TBM using compressed air from the new forth bore. |
||||||||||||||
| M-614 Chateau d'Olonne | 2006 | France |
|
M-614 Chateau d'Olonne
|
||||||||
| M-675 La Malata | 2006 | Spain |
|
M-675 La Malata
|
||||||||
| M-907M Großrohrschirm | 2009 | Schweiz |
|
M-907M Großrohrschirm
|
||||||||
| M-929 Kura West River Crossing | 2005 | Azerbaijan |
|
M-929 Kura West River Crossing
The oil and gas pipeline ?Blue Line? is under construction from Baku on the Caspian Sea via the country of Azerbaijan and Georgia through Turkey to the Mediterranean harbour of Ceyhan. The Herrenknecht TBM M-929M is a mixed shield slurry shield. The tunnel diameter is 1.60 m and the tunnel length is 2 x 400 metres. To support the working face the shield tunnelling machine will work in closed mode to permit maximum pressures of 3,0 bar, which is the equivalent of a water depth of 30 metres. |
||||||||||||
| M-971 Wuhan | 2007 | China |
|
M-971 Wuhan
|
||||||||
| M1061 Sea Outfall, Salvador de Bahia | 2009 - 2010 | Brasil |
|
M1061 Sea Outfall, Salvador de Bahia
|
||||||||
| NFM-CRTG Beijing | 2010 - 2012 | China |
|
|
NFM-CRTG Beijing
|
||||||
| NFM-Schlüchtern | 2009 | Germany |
|
NFM-Schlüchtern
|
||||||
| RS 3, 4, 5, 6, 16,18-H8 Jenbach | 2009 - 2010 | Austria |
|
RS 3, 4, 5, 6, 16,18-H8 Jenbach
|
||||||
| S-000 Bewag Tunnel, Berlin | 1997 | Germany |
|
S-000 Bewag Tunnel, Berlin
A cable tunnel for the Berlin utility company BEWAG. |
||||||||||
| S-108 4th Tube of the River Elbe Crossing Tunnel, Hamburg | 1997 - 2000 | Germany |
|
S-108 4th Tube of the River Elbe Crossing Tunnel, Hamburg
Trude, the world largest TBM with a diameter of 14.2 m, broke through safely and inch-perfect in Hamburg Othmarschen on 2nd March 2002 after driving 2,561 metres underground. The 4th Tube of the River Elbe Crossing Tunnel was completed in two years and five months. Trude's breakthrough marked a new milestone in tunnel construction. |
||||||||||||||
| S-110 Railway Tunnel, Berlin | 2000 | Germany |
|
|
S-110 Railway Tunnel, Berlin
The two identical Herrenknecht mixshield TBMs completed the first four bores in the north section of the railway tunnel. The first of the two machines started tunnelling at the end of December 1999. A specially developed membrane system provided the necessary level of safety during the four shield launches. |
||||||||||||||
| S-127 Socatoptunnel, Paris | 2000 / 2004 / 2006 | France |
|
S-127 Socatoptunnel, Paris
The TBM S-127 Socatop was built to bore the A86 motorway tunnel in Paris. The project was split up into two sections, VL 1 and VL 2, each approx. 5 km long. The TBM used was an adjustable mixshield enabling changeovers between bentonite (slurry), EPB or semi-open mode, depending on the geology the machine could be easily converted from EPB to slurry mode and vice versa within two days. |
||||||||||||||
| S-137 Westerschelde, Terneuzen | 1998 - 2002 | The Netherlands |
|
S-137 Westerschelde, Terneuzen
The statistics say it all: up to 60 metres underground, and with a total length of 6.6 km and pressures of up to 6.5 bars. Two Herrenknecht TBMs drove under the Westerschelde River to create a road tunnel linking Zuid-Beveland and Zeeuwsch-Vlaanderen in the Dutch province of Zeeland. |
||||||||||||||
| S-138 Westerschelde, Terneuzen | 1998 - 2002 | The Netherlands |
|
S-138 Westerschelde, Terneuzen
|
||||||||||||
| S-138 Westerschelde, Terneuzen | 1998 - 2002 | The Netherlands |
|
S-138 Westerschelde, Terneuzen
The statistics say it all: up to 60 metres underground, and with a total length of 6.6 km and pressures of up to 6.5 bars. Two Herrenknecht TBMs drove under the Westerschelde River to create a road tunnel linking Zuid-Beveland and Zeeuwsch-Vlaanderen in the Dutch province of Zeeland. |
||||||||||||||
| S-140 Thalwil Tunnel, Zurich | 2000 - 2001 | Switzerland |
|
S-140 Thalwil Tunnel, Zurich
Two Herrenknecht shields successfully accomplished their mission in the Zurich-Thalwil core project of the Bahn 2000 (Railway 2000) project (Zimmerberg Base Tunnel). In March 1999, the mixshield TBM (Ø 12.36 m) launched from contract section 2.01. On the 2.7 km route, ca. 2,000 m was through freshwater molasse and ca. 700 m through soft mixed ground (crushed stone and deposits). The mix shield was equipped to drive through rock and soft mixed ground. |
||||||||||||||
| S-149 PTS-Tunnel, Zürich-Kloten Airport | 2000 - 2001 | Switzerland |
|
S-149 PTS-Tunnel, Zürich-Kloten Airport
From autumn 1999 to summer 2001, a Herrenknecht hydroshield TBM S-149 drove under the runway at Zürich-Kloten Airport in Switzerland. The two tunnels, 970 m and 990 m respectively, are used as pedestrian passenger tunnels. |
||||||||||||||
| S-150 Sophiaspoortunnel, Rotterdam | 2001 - 2002 | The Netherlands |
|
S-150 Sophiaspoortunnel, Rotterdam
The Mixshield TBM drove a Railway Tunnel (2 x 4.2 km ) for Rail freight traffic. As part of the 160 km-long Betuwe Route, which links the Port of Rotterdam with the German border, the Sophiaspoor Tunnel runs under the Rotterdam-Dordrecht Railway, the A16 Motorway, the Rivers Rietbaan and De Noord, and the A15 Motorway. |
||||||||||||||
| S-152 Wesertunnel, Kleinensiel | 2000 - 2001 | Germany |
|
S-152 Wesertunnel, Kleinensiel
From July 1999 to 2001, a Herrenknecht mixshield TBM drove its way over to the opposite bank of the River Weser in Kleinensiel. The new four-lane road (two bores) forms a high-capacity link between the B 212, B 437 and the A 27. |
||||||||||||||
| S-164 Lefortovo Tunnel, Moscow | 2001 - 2005 | Russia |
|
S-164 Lefortovo Tunnel, Moscow
The Herrenknecht mixshield TBM (Ø 14.20 m), the largest of its kind in the world, drove its way under Moscow. The refurbished shield drove a 2,222 m-long tunnel, which is part of the third orbital peripheral road in the east of Moscow. |
||||||||||||||
| S-168 Pannerdenschkanaal Tunnel | 2001 - 2002 | The Netherlands |
|
S-168 Pannerdenschkanaal Tunnel
The mixshield TBM drove a railway tunnel (2 x 1.6 km) for rail freight traffic. As part of the 160 km-long Betuwe route, which links the Port of Rotterdam with the German border, the railway tunnel runs under the Pannerdensch canal between Bemel and Zeveneer. |
||||||||||||||
| S-170 Deep Sewerage Singapore | 2002 | Singapore |
|
S-170 Deep Sewerage Singapore
"Deep Tunnel for Deep Sewerage" mit diesem Projekt stattet sich Singapur mit einem gigantischen und hochmodernen Abwassersystem für die Zukunft aus. |
||||||||||||
| S-175 Oenzbergtunnel | 2002 - 2003 | Switzerland |
|
S-175 Oenzbergtunnel
|
||||||||||||||
| S-185 Heathrow Airport, London | 2003 | England |
|
S-185 Heathrow Airport, London
To provide an optimum logistical link between the western section of the airport and the main terminal, an underground airside road tunnel was built, consisting of two parallel bores, each 1,264 metres in length. |
||||||||||||||
| S-187 Metro Caracas | 2003 - 2004 | Venezuela |
|
S-187 Metro Caracas
|
||||||
| S-192 CTRL Contract 320 Thames Tunnel | 2002 - 2003 | England |
|
S-192 CTRL Contract 320 Thames Tunnel
To the east of London, two 2,500 m-long railway tunnels were constructed as part of the CTRL (Channel Tunnel Rail Link) project. As from 2007, the single track tunnels will link the British capital with the Eurotunnel (Channel Tunnel), thus shortening the travel time between London and Paris to 2 hours and 15 minutes. The British Tunnelling Society recognised the excellent teamwork by presenting the "Major Project Award" to the construction team for this section. |
||||||||||||||
| S-200 Herrentunnel, Lübeck | 2002 - 2003 | Germany |
|
S-200 Herrentunnel, Lübeck
The two-bore, 780 m-long Tunnel was driven by a Hydroshield TBM. |
||||||||||||
| S-205 Peristeri Metro, Athens | 2002 | Greece |
|
S-205 Peristeri Metro, Athens
This equipment consists of a shield machine with partial face excavation (open tunnelling machine) intended for tunnelling the "Athens Metro" |
||||||||||||||
| S-209 Aanleg Spoortunnel, Antwerp | 2003 | Belgium |
|
S-209 Aanleg Spoortunnel, Antwerp
For the north-south railway link between Brussels and Amsterdam two new 1,230 m bores were driven under the centre of Antwerp to the city's historical station, Antwerp Central. |
||||||||||||||
| S-221 Ute Gorg | 2009 | Spain |
|
S-221 Ute Gorg
|
||||||||||
| S-221 Ute Gorg Linia 9 | 2004 - 2007 | Spain |
|
S-221 Ute Gorg Linia 9
Der mit einem Durchmesser von 12,06 m größte Erddruck-Schild der Welt hat seine Arbeit für die Metro Linie 9 in Barcelona im September 2003 aufgenommen. Der Bohrgigant stellt nicht nur hinsichtlich seines Durchmessers einen Weltrekord auf. Der EPB-Schild verfügt auch über das höchste, jemals in eine TBM installierte Drehmoment von 45 Millionen Nm. Auf dieser Maschine wurden nun zum ersten Mal Arbeiten in Überdruck bei 2,0 bar erfolgreich von der Nordseetaucher GmbH ausgeführt und damit auch zum ersten Mal auf einer Tunnelmaschine in Spanien. |
||||||||||||||
| S-227 Esfahan | 2007 - 2010 | Iran |
|
S-227 Esfahan
|
||||||||
| S-228 Esfahan | 2010 | Iran |
|
S-228 Esfahan
|
||||||||
| S-238 Metro Tunnel, Neapel | 2004 | Italy |
|
S-238 Metro Tunnel, Neapel
Die Linie 1 soll als Ringlinie den Flughafen der Stadt an das Metronetz anbinden. Bis 2006 sollen die Arbeiten abgeschlossen sein, dann werden täglich rund 200.000 Fahrgäste die Metro nutzen. |
||||||||||||||
| S-242 Metro Linie 3, Guangzhou | 2004 | China |
|
S-242 Metro Linie 3, Guangzhou
In einem Zeitraum von viereinhalb Jahren soll die 36,86 km lange Metrolinie hergestellt werden. Die Strecke verläuft vom Norden in den Süden von Guangzhou. Dabei werden 3 Flüsse unterquert und einige Abschnitte mit sehr komplexen geologischen und hydrologischen Verhältnissen durchfahren. |
||||||||||||||
| S-246 Hallandsas, Föslöv | 2010 | Sweden |
|
S-246 Hallandsas, Föslöv
|
||||||
| S-250 Silberwald, Moskow | 2004 - 2006 | Russia |
|
S-250 Silberwald, Moskow
|
||||||||||||
| S-252 Kuala Lumpur | 2004 - 2005 | Malaysia |
|
S-252 Kuala Lumpur
Der SMART-Tunnel ("Stormwater Management and Road Tunnel") ist ein Großprojekt des malaysischen Staates. Die überwiegende Zeit des Jahres soll ein Teil des Großtunnels das Pkw- und Lkw-Aufkommen der Metropole unterirdisch abfangen und durch die Stadt verteilen. In der Zeit des Monsunregens soll der Tunnel gesperrt und die hereinbrechenden Wassermassen kanalisieren und so überirdische Überflutungen abmildern. |
||||||||||||
| S-255 Metrotren Gijon | 2005 - 2006 | Spain |
|
S-255 Metrotren Gijon
|
||||||||||||
| S-258 Flughafen S-Bahn, Hamburg | 2005 - 2006 | Germany |
|
S-258 Flughafen S-Bahn, Hamburg
Die Flughafen S-Bahn soll den Flughafen Hamburg Fulsbüttel mit der U-Bahn Station Ohlsdorf, Wellingsbütteler Landstrasse verbinden. Die TBM S-258 ist ein Mixschild mit einem Gewicht von ca. 390 t und einer Länge von 65 m, inkl. der Nachläufer. Die Schildvortriebstrecke hat einen Durchmesser von 6,90 m. Die Länge der Strecke beträgt 2 x 1.750 m. |
||||||||||||
| S-260 Metrobus Brescia | 2006 - 2009 | Italy |
|
S-260 Metrobus Brescia
|
||||||
| S-264 Katzenberg | 2007 | Germany |
|
S-264 Katzenberg
|
||||||||||||
| S-265 Katzenberg | 2007 | Germany |
|
S-265 Katzenberg
|
||||||||||||
| S-290 Silberwald Servicetunnel, Moskau | 2006 - 2007 | Russio |
|
S-290 Silberwald Servicetunnel, Moskau
|
||||||||||
| S-302 Metro de Madrid | 2005 | Spain |
|
S-302 Metro de Madrid
|
||||||||
| S-307 Singapore | 2009 | Singapore |
|
S-307 Singapore
|
||||||||||||||
| S-308 Singapore | 2009 | Singapore |
|
S-308 Singapore
|
||||||||||||
| S-314 Nord-Süd Stadtbahn Köln, Los Nord | 2006 - 2007 | Germany |
|
S-314 Nord-Süd Stadtbahn Köln, Los Nord
|
||||||||||||
| S-317 Traffic Tunnel Shanghai | 2007 | China |
|
S-317 Traffic Tunnel Shanghai
|
||||||||||||
| S-318 Traffic Tunnel Shanghai | 2007 | China |
|
S-318 Traffic Tunnel Shanghai
|
||||||||||||
| S-320 Almatymetrokurylys | Kasachstan |
|
S-320 Almatymetrokurylys
|
||||||
| S-321 Nord-Süd Stadtbahn Köln, Los Süd | 2006 - 2007 | Germany |
|
S-321 Nord-Süd Stadtbahn Köln, Los Süd
|
||||||||||||
| S-322 Nord-Süd Stadtbahn Köln, Los Süd | 2006 - 2007 | Germany |
|
S-322 Nord-Süd Stadtbahn Köln, Los Süd
|
||||||||||||
| S-324 Metrotunnel Ankara | 2006 | Turkey |
|
S-324 Metrotunnel Ankara
|
||||||||
| S-325 Istanbul | 2006 | Turkey |
|
S-325 Istanbul
|
||||||||
| S-326 City Tunnel Leipzig | 2006 - 2008 | Germany |
|
S-326 City Tunnel Leipzig
|
||||||||||||
| S-327 Durban Harbour Tunnel | 2006 | South Africa |
|
S-327 Durban Harbour Tunnel
The Harbour Tunnel is under construction from Durban Point Road to Durban Bluff. The tunnel will be build for the future widening and deepening of the Durban Harbour Entrance. The Herrenknecht TBM S 327 is a mixed shield slurry machine. Diameter is 5.150 mm, tunnel length is 515 metres, maximum pressures of 4,0 bar. |
||||||||||||
| S-328 Metro Strogino Moskau | 2006 - 2007 | Russia |
|
S-328 Metro Strogino Moskau
|
||||||||||||||
| S-331 Kobenhavns Fjernvarme Tunnel | 2006 | Denmark |
|
S-331 Kobenhavns Fjernvarme Tunnel
|
||||||||||||
| S-334 U-Bahn Tunnel München-Moosach | 2007 - 2008 | Germany |
|
S-334 U-Bahn Tunnel München-Moosach
|
||||||||||||
| S-340 Citytunnel Malmö | 2006 - 2008 | Sweden |
|
S-340 Citytunnel Malmö
|
||||||||||||
| S-341 Citytunnel Malmö | 2006 - 2008 | Sweden |
|
S-341 Citytunnel Malmö
|
||||||||||||
| S-349 Nanjing | 2008 - 2009 | China |
|
S-349 Nanjing
|
||||||||||||||
| S-350 Nanjing | 2008 - 2009 | China |
|
S-350 Nanjing
|
||||||||||||||
| S-352 H 3-4 Münster / Wiesing | 2007 - 2008 | Austria |
|
S-352 H 3-4 Münster / Wiesing
|
||||||||||||
| S-353 Silberwald, Moskau | 2006 - 2007 | Russia |
|
S-353 Silberwald, Moskau
|
||||||
| S-354 Budapest | 2009 | Hungary |
|
S-354 Budapest
|
||||||||
| S-358 Yellow River | 2008 | China |
|
S-358 Yellow River
|
||||||||||
| S-362 Girona | 2010 | Spain |
|
S-362 Girona
|
||||||
| S-381 H8 Jenbach | 2007 - 2009 | Austria |
|
S-381 H8 Jenbach
|
||||||||||||
| S-389 Thun | 2007 | Switzerland |
|
S-389 Thun
|
||||||||||||
| S-407 Qing Cao Sha | 2008 | China |
|
S-407 Qing Cao Sha
|
||||||||||||||
| S-408 Water Tunnel Shanghai | 2009 | China |
|
S-408 Water Tunnel Shanghai
|
||||||||||
| S-419 Finnetunnel | 2008 - 2009 | Germany |
|
S-419 Finnetunnel
|
||||||||||||
| S-420 Finnetunnel | 2008 - 2009 | Germany |
|
S-420 Finnetunnel
|
||||||||||||
| S-423 Metro Cairo | 2009 | Egypt |
|
|
S-423 Metro Cairo
|
||||||||
| S-440 U4 HafenCity, Hamburg | 2008 - 2010 | Germany |
|
S-440 U4 HafenCity, Hamburg
|
||||||||||||
| S-444 Ute Av. Trinidad | 2009 | Spain |
|
S-444 Ute Av. Trinidad
|
||||||||
| S-451 Tunnel Weinberg, Zürich | 2010 | Switzerland |
|
S-451 Tunnel Weinberg, Zürich
|
||||||||||||
| S-452 ATUBO Biel | 2010 | Switzerland |
|
S-452 ATUBO Biel
|
||||||||
| S-464 Diabolo Tunnel | 2009 | Belgium |
|
S-464 Diabolo Tunnel
|
||||||
| S-477 Guangzhou | 2009 | China |
|
S-477 Guangzhou
|
||||||
| S-491 Wehrhahn-Linie Düsseldorf | 2010 - 2011 | Germany |
|
S-491 Wehrhahn-Linie Düsseldorf
|
||||||||||
| S-502 Lake Mead Project, Las Vegas | 2011 | United States of America |
|
S-502 Lake Mead Project, Las Vegas
|
||||||||
| S-509 CRTG Metro Wuhan | 2010 | China |
|
S-509 CRTG Metro Wuhan
|
||||||||||
| S-525 Metro Sofia | 2010 | Bulgaria |
|
S-525 Metro Sofia
|
||||||||
| S-532 LocoBouw, Antwerpen | 2010 | Belgium |
|
S-532 LocoBouw, Antwerpen
|
||||||||||
| S-544 XFEL Tunnel, Hamburg | 2010 - 2012 | Germany |
|
S-544 XFEL Tunnel, Hamburg
|
||||||||||||
| S-545 XFEL Tunnel Hamburg | 2010 - 2012 | Germany |
|
S-545 XFEL Tunnel Hamburg
|
||||||||||||
| S-546 Metro B Lyon | 2011 | France |
|
S-546 Metro B Lyon
|
||||||||
| S-547 Neuer Kaiser-Wilhelm Tunnel, Cochem | 2010 - 2011 | Germany |
|
S-547 Neuer Kaiser-Wilhelm Tunnel, Cochem
|
||||||||||||
| S-550 Railway Tunnel Shenzhen | 2011 | China |
|
|
S-550 Railway Tunnel Shenzhen
|
||||||
| S-551 Nuclear Tunnel Project Taishan | 2010 | China |
|
S-551 Nuclear Tunnel Project Taishan
|
||||||||
| S-597 Metro Hangzhou | 2011 | China |
|
S-597 Metro Hangzhou
|
||||||
| S-598 Metro Hangzhou | 2011 | China |
|
S-598 Metro Hangzhou
|
||||||
| S-618 MTR West Island Tunnel | 2011 | Hong Kong |
|
S-618 MTR West Island Tunnel
TBM Inspection |
||||||||
| S-630 XRL 820 Mei Lai Road - Hoi Ting Road Tunnel Project | 2012 | Hong Kong |
|
S-630 XRL 820 Mei Lai Road - Hoi Ting Road Tunnel Project
The Guangzhou-Shenzhen-Hong Kong Express Rail Link is a committed cross boundary transport infrastructure project, which will provide high speed rail services between Hong Kong and Guangzhou, and a connection to the national high-speed passenger rail network serving major mainland cities outside of Guangdong province. This network, which will comprise some 16,000km, is now under construction in the Mainland. |
||||||||||||
| S-631 XRL 820 Mei Lai Road - Hoi Ting Road Tunnel Project | 2012 | Hong Kong |
|
S-631 XRL 820 Mei Lai Road - Hoi Ting Road Tunnel Project
|
||||||||||||
| S-642 Wisla River Crossing Warsaw | 2011 | Poland |
|
S-642 Wisla River Crossing Warsaw
|
||||||||