loading... | |
Head Office Ammersbek | |
Tel.: | +49 4102 23180 |
Fax.: | +49 4102 231820 |
Mobile: | +49 173 6990120 |
Branch Office Bremerhaven | |
Mobile: | +49 172 4557200 |
Nuclear Diving » Reference List Overview
Nordseetaucher inspected the welding seams in the stainless steel liner sections of the fuel element pool and covered them with an additional coating to ensure that they remained leak proof. This contract, which was carried out in cooperation with Siemens/KWU, took 17 weeks.
In cooperation with Siemens/KMU, we repaired and recoated several small defects in the liner of the fuel rod storage pool. The job took 5 weeks.
|
In cooperation with Framatome-Siemens, we replaced several of the storage racks in the fuel rod storage pool with new racks with a greater capacity.
The job took 8 weeks.
Together with Framatome AnP we carried out maintenance work in the reactor pool and the settling pool at the research reactor FRM II Garching by Munich.
© 2024 NORDSEETAUCHER GmbH | Home | About Us | Sitemap | Privacy Policy | Imprint